TM-9-2320-365-20-4 LMTV Unit Maintenance Manual M1078 Series - Volume 4 Download

Page 369 of 968

TM 9-2320-365-20-4 (16) Remove conduit nut (32) from conduit connector (33). (17) Remove two ferrules (34) and conduit nuts (20 and 32) from conduit (31). (18) Remove lock nut (35) and conduit connector (33) from raceway (28). d. Interior Field Telephone Binding Post/Box and Conduit Installation. NOTE • PHONE 1 and PHONE 2 field telephone binding posts/boxes and conduits are removed the same way. PHONE 1 positive field telephone binding post/box and conduit shown. • Perform steps (1) through (8) for conduit installation. (1) Install conduit connector (1) in raceway (2) with lock nut (3). (2) Position conduit nuts (4 and 5) and two ferrules (6) on conduit (7). (3) Install conduit nut (4) on conduit connector (1). 16-321