TM-9-2320-365-20-4 LMTV Unit Maintenance Manual M1078 Series - Volume 4 Download
Page 361 of 968
TM 9-2320-365-20-4  16-51. M1079 FIELD TELEPHONE BINDING POST/BOX AND CONDUIT REPLACEMENT  This task covers:  a. Exterior Field Telephone Binding Post Removal  b. Exterior Field Telephone Binding Post  Installation  c. Interior Field Telephone Binding Post/Box and  Conduit Removal  d. Interior Field Telephone Binding Post/Box and  Conduit Installation  e. Follow-On Maintenance  INITIAL SETUP  Equipment Conditions  Field telephone disconnected (TM 9-2320-365-  10).  AC power disconnected (TM 9-2320-365-10).  Batteries disconnected (para 7-48).  110 vac outlet/box and conduit removed (for  removal of field telephone box or conduit) (para  16-53).  Tools and Special Tools  Tool Kit, Genl Mech (Item 44, Appendix C)  Tool Kit, Auto Fuel and Electrical Systems Repair  (Item 42, Appendix C)  Materials/Parts  Dispenser, Pressure Sensitive Adhesive Tape (Item  21, Appendix D)  Lockwasher (28) (van body serial numbers 001  through 190) (Item 77, Appendix G)  Lockwasher (16) (van bodies serial number 191 and  higher) (Item 77, Appendix G)  Lockwasher (12) (Item 81, Appendix G)  Terminal, Lug (2) (Item 266, Appendix G)  Terminal, Lug (4) (Item 269, Appendix G)  Personnel Required  (2)  a. Exterior Field Telephone Binding Post Removal.  NOTE  • Both exterior field telephone binding posts are  removed the same way. Negative exterior field  telephone binding post shown.  • Perform step (1) on van body serial numbers  001 through 190.  (1) Remove 28 screws (1), lockwashers (2), washers (3),  and cover (4) from 110/208 vac power entry panel (5).  Discard lockwashers.  16-313