TM-9-2320-365-20-3 LMTV Unit Maintenance Manual M1078 Series - Volume 3 Download
Page 933 of 1268
TM 9-2320-365-20-3 12-8. FRONT AXLE CENTRAL TIRE INFLATION SYSTEM (CTIS) QUICK RELEASE VALVE REPLACEMENT This task covers: a. Removal b. Installation c. Follow-On Maintenance INITIAL SETUP Equipment Conditions Engine shut down (TM 9-2320-365-10). Air tanks drained (TM 9-2320-365-10). Tools and Special Tools Tool Kit, Genl Mech (Item 44, Appendix C) Goggles, Industrial (Item 15, Appendix C) Materials/Parts Dispenser, Pressure Sensitive Adhesive Tape (Item 21, Appendix D) Antiseize Compound (Item 63, Appendix D) Nut, Self-Locking (2) (Item 148, Appendix G) WARNING Wear appropriate eye protection when working under vehicle due to the possibility of falling debris. Failure to comply may result in injury to personnel. a. Removal. NOTE Tag air hoses and connection points before disconnecting. (1) Disconnect three air hoses (1) from quick release valve (2). (2) Remove two self-locking nuts (3) and washers (4) from screws (5). Discard self-locking nuts. (3) Remove two screws (5), washers (6), and quick release valve (2) from frame (7). Change 1 12-19