TM-9-2320-365-20-3 LMTV Unit Maintenance Manual M1078 Series - Volume 3 Download

Page 864 of 1268

TM 9-2320-365-20-3 11-20. SECONDARY AND PRIMARY AIR TANKS REPLACEMENT This task covers: a. Secondary Air Tank Removal b. Secondary Air Tank Installation c. Primary Air Tank Removal d. Primary Air Tank Installation e. Follow-On Maintenance INITIAL SETUP Equipment Conditions Engine shut down (TM 9-2320-365-10). Air tanks drained (TM 9-2320-365-10). Tools and Special Tools Tool Kit, Genl Mech (Item 44, Appendix C) Goggles, Industrial (Item 15, Appendix C) Wrench, Torque, 0-175 lb-ft (Item 57, Appendix C) Materials/Parts Dispenser, Pressure Sensitive Adhesive Tape (Item 21, Appendix D) Antiseize Compound (Item 63, Appendix D) Nut, Self-Locking (2) (Item 122.1, Appendix G) WARNING Wear appropriate eye protection when working under vehicle due to the possibility of falling debris. Failure to comply may result in injury to personnel. a. Secondary Air Tank Removal. NOTE Tag air hoses and connection points prior to disconnecting. (1) Disconnect air hose (1) from 90-degree fitting (2). (2) Disconnect air hose (3) from 90-degree fitting (4). (3) Disconnect air hose (5) from branch tee fitting (6). 11-106 Change 1