TM-9-2320-365-20-3 LMTV Unit Maintenance Manual M1078 Series - Volume 3 Download
Page 826 of 1268
TM 9-2320-365-20-3  11-13. RELAY VALVE REPLACEMENT  This task covers:  a. Removal  b. Installation  c. Follow-On Maintenance  INITIAL SETUP  Equipment Conditions  Engine shut down (TM 9-2320-365-10).  Air tanks drained (TM 9-2320-365-10).  Tools and Special Tools  Goggles, Industrial (Item 15, Appendix C)  Tool Kit, Genl Mech (Item 44, Appendix C)  Wrench, Torque, 0-175 lb-ft (Item 57, Appendix C)  Materials/Parts  Dispenser, Pressure Sensitive Adhesive Tape  (Item 21, Appendix D)  Antiseize Compound (Item 63, Appendix D)  Nut, Self-Locking (2) (Item 148, Appendix G)  WARNING  Wear appropriate eye protection when  working under vehicle due to the  possibility of falling debris. Failure to  comply may result in injury to  personnel.  a. Removal.  NOTE  Tag air hoses and connection points prior to  disconnecting.  (1) Disconnect two air hoses (1) from 90-degree fittings (2).  (2) Disconnect two air hoses (3) from fittings (4).  (3) Disconnect air hose (5) from 90-degree fitting (6).  (4) Disconnect air hose (7) from 45-degree fitting (8).  11-70 Change 1