TM-9-2320-365-20-3 LMTV Unit Maintenance Manual M1078 Series - Volume 3 Download

Page 807 of 1268

TM 9-2320-365-20-3 11-10. LOAD SENSING VALVE AND CONTROL CABLE REPLACEMENT/ADJUSTMENT This task covers: a. Load Sensing Valve Control Cable Removal b. Load Sensing Valve Control Cable Installation c. Load Sensing Valve Removal d. Load Sensing Valve Installation e. Load Sensing Valve Adjustment f. Follow-On Maintenance INITIAL SETUP Equipment Conditions Engine shut down (TM 9-2320-365-10). Air tanks drained (TM 9-2320-365-10). Tools and Special Tools Goggles, Industrial (Item 15, Appendix C) Tool Kit, Genl Mech (Item 44, Appendix C) Wrench, Torque, 0-175 lb-ft (Item 57, Appendix C) STE/ICE-R (Item 39, Appendix C) Materials/Parts Dispenser, Pressure Sensitive Adhesive Tape (Item 21, Appendix D) Materials/Parts (Cont) Antiseize Compound (Item 63, Appendix D) Tee, Pipe (Item 75.1, Appendix D) Nut, Self-Locking (2) (Item 148, Appendix G) Nut, Self-Locking (2) (Item 150, Appendix G) References TM 9-4910-571-12 & P Personnel Required (2) WARNING Wear appropriate eye protection when working under vehicle due to the possibility of falling debris. Failure to comply may result in injury to personnel. a. Load Sensing Valve Control Cable Removal. (1) Loosen jam nut (1) on cable clamp (2). (2) Loosen screw (3) on cable clamp (2). (3) Remove load sensing valve control cable (4) from cable clamp (2). (4) Remove screw (5) and load sensing valve control cable (4) from bracket (6). Change 1 11-53