TM-9-2320-365-20-3 LMTV Unit Maintenance Manual M1078 Series - Volume 3 Download
Page 115 of 1268
TM 9-2320-365-20-3 b. Ether Cylinder Installation. (1) Remove cap (1) from ether valve (2). (2) Install cap (2) on cap retainer (3). (3) Install gasket (4) in ether valve (2). (4) Position ether cylinder (5) in clamp (6). (5) Install ether cylinder (5) on ether valve (2). (6) Install wingnut (7) on clamp (6). c. Clamp Removal. Remove two self-locking nuts (1), screws (2), and clamp (3) from spare tire retainer (4). Discard self-locking nuts. d. Clamp Installation. (1) Position clamp (1) on spare tire retainer (2) with two screws (3) and self-locking nuts (4). (2) Tighten two self-locking nuts (4) to 25-31 lb-ft (34-42 N·m). Change 1 4-83