TM-9-2320-365-20-2 LMTV Unit Maintenance Manual M1078 Series - Volume 2 Download
Page 95 of 1432
TM 9-2320-365-20-2 TM 9-2320-365-20-2 TM 9-2320-365-20-2 TM 9-2320-365-20-2 TM 9-2320-365-20-2  2-1149 2-1149 2-1149 2-1149 2-1149  CONTINUITY TEST  (1) Open door on 110/208 VAC POWER  DISTRIBUTION PANEL (TM 9-2320-365-10).  (2) Position circuit breaker CB1 to OFF  (TM 9-2320-365-10).  (3) Remove two screws and cover from  INTERIOR LIGHTS switch outlet box.  (4) Remove diffuser from lighting fixture DS83.  (5) Remove tube lock holder from each end of  two fluorescent lamps.  (6) Remove two fluorescent lamps from lighting  fixture DS83.  (7) Remove ballast cover from lighting fixture  DS83.  (8) Set multimeter to ohms.  (9) Connect positive (+) probe of multimeter to  bottom left pole of INTERIOR LIGHTS switch  S32.  (10) Connect negative (-) probe of multimeter to  wire 706B in lighting fixture DS83 and note  reading on multimeter.  (11) If continuity is not present, repair or replace  wire 706B from lighting fixture DS83 to DS82  (para 2-40).  (12) Install cover on INTERIOR LIGHTS switch outlet  box S32 with two screws.