TM-9-2320-365-20-2 LMTV Unit Maintenance Manual M1078 Series - Volume 2 Download

Page 91 of 1432

TM 9-2320-365-20-2 TM 9-2320-365-20-2 TM 9-2320-365-20-2 TM 9-2320-365-20-2 TM 9-2320-365-20-2 2-1145 2-1145 2-1145 2-1145 2-1145 CONTINUITY TEST (16) Install cover on 110/208 VAC POWER DISTRIBUTION PANEL with six screws. (17) Open door on 110/208 VAC POWER DISTRIBUTION PANEL (TM 9-2320-365-10). (18) Position circuit breaker CB1 to ON (TM 9-2320-365-10). (19) Close door on 110/208 VAC POWER DISTRIBUTION PANEL (TM 9-2320-365-10). (1) Loosen screw in terminal board TB3. (2) Remove wire 3085B from terminal board TB3. (3) Set multimeter to ohms. (4) Connect positive (+) probe of multimeter to wire 3085B. (5) Connect negative (-) probe of multimeter to wire 3085AJ and note reading on multimeter. (6) If continuity is not present, repair or replace wire 3085AJ from lighting fixture DS83 to DS82 (para 2-40). (7) If continuity is present, replace lighting fixture DS82 (para 16-59). (8) Install ballast cover on lighting fixture DS82. (9) Install two fluorescent lamps in lighting fixture DS82. (10) Install tube lock holder at each end of two fluorescent lamps. (11) Install diffuser on lighting fixture DS82. (12) Install wire 3085B on terminal board TB3. (13) Tighten screw in terminal board TB3. (14) Install wire 1499K on terminal board TB4. (15) Tighten screw in terminal board TB4.