TM-9-2320-365-20-2 LMTV Unit Maintenance Manual M1078 Series - Volume 2 Download

Page 55 of 1432

TM 9-2320-365-20-2 TM 9-2320-365-20-2 TM 9-2320-365-20-2 TM 9-2320-365-20-2 TM 9-2320-365-20-2 2-1109 2-1109 2-1109 2-1109 2-1109 CONTINUITY TEST (1) Remove six screws and cover from 110/208 VAC POWER DISTRIBUTION PANEL. (2) Remove circuit breaker CB6 from 110/208 VAC POWER DISTRIBUTION PANEL. (3) Position circuit breaker CB6 to ON. (4) Set multimeter to ohms. (5) Connect positive (+) probe of multimeter to output terminal of circuit breaker CB6. (6) Connect negative (-) probe of multimeter to input terminal of circuit breaker CB6 and note reading on multimeter. (7) If continuity is not present, replace circuit breaker CB6 (para 16-64). (8) Install circuit breaker CB6 on 110/208 VAC POWER DISTRIBUTION PANEL.