TM-9-2320-365-20-2 LMTV Unit Maintenance Manual M1078 Series - Volume 2 Download

Page 469 of 1432

CONTINUITY TEST (1) Remove seven screws and washers from WTEC II VIM cover. (2) Remove screw, washer, cover, and nut from WTEC II VIM. (3) Remove 10 AMP MAIN POWER fuse from WTEC II VIM. (4) Set multimeter to ohms. (5) Connect positive (+) probe of multimeter to one terminal on 10 AMP MAIN POWER fuse. (6) Connect negative (-) probe of multimeter to other terminal on 10 AMP MAIN POWER fuse and note reading on multimeter. (7) If continuity is not present, replace 10 AMP MAIN POWER fuse (para 8-6). (8) If continuity is present replace WTEC II VIM (para 8-6). TM 9-2320-365-20-2 Change 1 2-1482.39