TM-9-2320-365-20-2 LMTV Unit Maintenance Manual M1078 Series - Volume 2 Download
Page 355 of 1432
RESISTANCE TEST TM 9-2320-365-20-2 Change 1 2-1409 Table 2-23. Transmission Solenoid F and G Resistance Test Points Sub Code Affected Solenoid Connector P119 High Connector P119 Low 21 26 F N F K H A (1) Set multimeter to ohms. (2) Connect positive (+) probe of multimeter to connector P119. Refer to Table 2-23. Transmission Solenoid F and G Resistance Test Points. (3) Connect negative (-) probe of multimeter to connector P119 and note reading on multimeter. Refer to Table 2-23. Transmission Solenoid F and G Resistance Test Points. (4) Connect negative (-) probe of multimeter to all other pins in connector P119, one at a time, and note reading on multimeter. (5) Connect negative (-) probe of multimeter to ground and note reading on multimeter. (6) If good resistance is not noted in step 3, or continuity is present in step 4 or step 5, replace WTEC II cab transmission harness (para 7-86). (7) If good resistance is noted in step 3, and continuity is not present in step 4 or step 5, replace WTEC II TEPSS (para 8-2). (8) Connect connector P119 to connector J119. (9) Position front grille on cab with washer and screw. (10) Position two washers and screws in front grille. (11) Tighten screw to 48-60 lb-in. (5-7 N·m). (12) Tighten two screws to 24 lb-in. (3 N·m). (13) Connect connectors J114 and J115 to WTEC II TEPSS. (14) Install instrument panel assembly (para 7-15). (15) Clear diagnostic codes (para 8-4).