TM-9-2320-365-20-2 LMTV Unit Maintenance Manual M1078 Series - Volume 2 Download
Page 35 of 1432
TM 9-2320-365-20-2 TM 9-2320-365-20-2 TM 9-2320-365-20-2 TM 9-2320-365-20-2 TM 9-2320-365-20-2  2-1089 2-1089 2-1089 2-1089 2-1089  CONTINUITY TEST  (1) Remove six screws and 110/208 VAC POWER  DISTRIBUTION PANEL cover from power  distribution panel.  (2) Remove circuit breaker CB8 from power  distribution panel.  (3) Position circuit breaker CB8 to ON.  (4) Set multimeter to ohms.  (5) Connect positive (+) probe of multimeter to  output terminal of circuit breaker CB8.  (6) Connect negative (-) probe of multimeter to  input terminal of circuit breaker CB8 and note  reading on multimeter.  (7) If continuity is not present, replace circuit  breaker CB8 (para 16-64).  (8) Install circuit breaker CB8 in power distribution  panel.