TM-9-2320-365-20-2 LMTV Unit Maintenance Manual M1078 Series - Volume 2 Download

Page 285 of 1432

TM 9-2320-365-20-2 TM 9-2320-365-20-2 TM 9-2320-365-20-2 TM 9-2320-365-20-2 TM 9-2320-365-20-2 2-1339 2-1339 2-1339 2-1339 2-1339 CONTINUITY TEST (1) Position circuit breaker CB1 to OFF. (2) Remove six screws and cover from 110/208 VAC POWER DISTRIBUTION PANEL. (3) Position circuit breaker CB1 to ON. (4) Set multimeter to ohms. (5) Connect positive (+) probe of multimeter to left output terminal of circuit breaker CB1. (6) Connect negative (-) probe of multimeter to left input terminal of circuit breaker CB1 and note reading on multimeter. (7) If continuity is not present, replace circuit breaker CB1 (para 16-65).