TM-9-2320-365-20-2 LMTV Unit Maintenance Manual M1078 Series - Volume 2 Download

Page 211 of 1432

TM 9-2320-365-20-2 TM 9-2320-365-20-2 TM 9-2320-365-20-2 TM 9-2320-365-20-2 TM 9-2320-365-20-2 2-1265 2-1265 2-1265 2-1265 2-1265 (10) Connect negative (-) probe of multimeter to bottom input terminal on circuit breaker CB2 and note reading on multimeter. (11) If continuity is not present in steps (6), (8), and (10), replace circuit breaker CB2 (para 16-64). (12) Install circuit breaker CB2 on 110/208 VAC POWER DISTRIBUTION PANEL. (1) Remove six screws and cover from 110/208 VAC POWER DISTRIBUTION PANEL. (2) Remove circuit breaker CB2 from 110/208 VAC POWER DISTRIBUTION PANEL. (3) Position circuit breaker CB2 to ON (TM 9-2320-365-10). (4) Set multimeter to ohms. (5) Connect positive (+) probe of multimeter to top output terminal on circuit breaker CB2. (6) Connect negative (-) probe of multimeter to top input terminal on circuit breaker CB2 and note reading on multimeter. (7) Connect positive (+) probe of multimeter to middle output terminal on circuit breaker CB2. (8) Connect negative (-) probe of multimeter to middle input terminal on circuit breaker CB2 and note reading on multimeter. (9) Connect positive (+) probe of multimeter to bottom output terminal on circuit breaker CB2. CONTINUITY TEST