TM-9-2320-365-20-2 LMTV Unit Maintenance Manual M1078 Series - Volume 2 Download
Page 165 of 1432
Change 1 2-1219 TM 9-2320-365-20-2 CONTINUITY TEST (1) Loosen screw in cover. (2) Open cover on relay box assembly. (3) Set multimeter to ohms. (4) Connect positive (+) probe of multimeter to K35 relay base terminal 9. (5) Connect negative (-) probe of multimeter to output terminal on circuit breaker CB9 and note reading on multimeter. (6) If continuity is not present, repair or replace wire 701C (para 2-40). (7) Install cover on 110/208 VAC POWER DISTRIBUTION PANEL with six screws.