TM-9-2320-365-20-2 LMTV Unit Maintenance Manual M1078 Series - Volume 2 Download
Page 163 of 1432
Change 1 2-1217 TM 9-2320-365-20-2 CONTINUITY TEST (1) Disconnect AC power (TM 9-2320-365-10). (2) Remove six screws and cover from 110/208 VAC POWER DISTRIBUTION PANEL. (3) Remove circuit breaker CB9 from 110/208 VAC POWER DISTRIBUTION PANEL. (4) Position circuit breaker CB9 to ON (TM 9-2320-365-10). (5) Set multimeter to ohms. (6) Connect positive (+) probe of multimeter to output terminal of circuit breaker CB9. (7) Connect negative (-) probe of multimeter to input terminal of circuit breaker CB9 and note reading on multimeter. (8) If continuity is not present, replace circuit breaker CB9 (para 16-64). (9) Install circuit breaker CB9 on 110/208 VAC POWER DISTRIBUTION PANEL.