TM-9-2320-365-20-2 LMTV Unit Maintenance Manual M1078 Series - Volume 2 Download

Page 161 of 1432

Change 1 2-1215 TM 9-2320-365-20-2 CONTINUITY TEST (1) Loosen screw in terminal board TB3. (2) Remove wire 3085J from terminal board TB3. (3) Set multimeter to ohms. (4) Connect positive (+) probe of multimeter to wire 3085J. (5) Connect negative (-) probe of multimeter to ground socket of 110 VAC receptacle J230 and note reading on multimeter. (6) If continuity is not present, repair or replace wire 3085J (para 2-40). (7) If continuity is present, repair or replace wire 3085AC (para 2-40). (8) Position wire 3085J on terminal board TB3. (9) Tighten screw in terminal board TB3. (10) Position wire 1499D on terminal board TB4. (11) Tighten screw in terminal board TB4. (12) Install cover on 110/208 VAC POWER DISTRIBUTION PANEL with six screws. (13) Install cover on 110 VAC outlet J230 with screw.