TM-9-2320-365-20-2 LMTV Unit Maintenance Manual M1078 Series - Volume 2 Download

Page 131 of 1432

Change 1 2-1185 TM 9-2320-365-20-2 CONTINUITY TEST (1) Disconnect AC power (TM 9-2320-365-10). (2) Remove six screws and cover from 110/208 VAC POWER DISTRIBUTION PANEL. (3) Remove circuit breaker CB5 from 110/208 VAC POWER DISTRIBUTION PANEL. (4) Position circuit breaker CB5 to ON (TM 9-2320-365-10). (5) Set multimeter to ohms. (6) Connect positive (+) probe of multimeter to output terminal of circuit breaker CB5. (7) Connect negative (-) probe of multimeter to input terminal of circuit breaker CB5 and note reading on multimeter. (8) If continuity is not present, replace circuit breaker CB5 (para 16-64). (9) Install circuit breaker CB5 on 110/208 VAC POWER DISTRIBUTION PANEL.