TM-9-2320-365-20-2 LMTV Unit Maintenance Manual M1078 Series - Volume 2 Download

Page 1139 of 1432

TM 9-2320-365-20-2 TM 9-2320-365-20-2 TM 9-2320-365-20-2 TM 9-2320-365-20-2 TM 9-2320-365-20-2 CONTINUITY TEST (1) Remove 18 screws and cover from base plate. (2) Set multimeter to ohms. (3) Connect positive (+) probe of multimeter to right top post of out solenoid. (4) Connect negative (-) probe of multimeter to right bottom post of out solenoid and note reading on multimeter. (5) If continuity is not present, replace out solenoid (para 20-70). 2-2111 2-2111 2-2111 2-2111 2-2111