TM-9-2320-365-20-2 LMTV Unit Maintenance Manual M1078 Series - Volume 2 Download

Page 1135 of 1432

TM 9-2320-365-20-2 TM 9-2320-365-20-2 TM 9-2320-365-20-2 TM 9-2320-365-20-2 TM 9-2320-365-20-2 2-2107 2-2107 2-2107 2-2107 2-2107 CONTINUITY TEST (1) Remove 18 screws and cover from base plate. (2) Set multimeter to ohms. (3) Connect positive (+) probe of multimeter to left top post of in solenoid. (4) Connect negative (-) probe of multimeter to left bottom post of in solenoid and note reading on multimeter. (5) If continuity is not present, replace in solenoid (para 20-70).