TM-9-2320-365-20-2 LMTV Unit Maintenance Manual M1078 Series - Volume 2 Download
Page 1091 of 1432
Change 2 2-2001 TM 9-2320-365-20-2 (1) Remove circuit breaker CB7 from Power Distribution Panel (PD1). (2) Set multimeter to ohms. (3) Connect positive (+) probe of multimeter to one terminal of circuit breaker CB7. (4) Connect negative (-) probe of multimeter to other probe of circuit breaker CB7 and note reading on multimeter. (5) If continuity is not present, replace circuit breaker CB7 (para 20-87). (6) If continuity is present, perform Special Purpose Kit Troubleshooting task u1. No Power to Digitization Rack. Perform steps (7) through (10), if continuity is present through circuit breaker CB7. (7) Install circuit breaker CB7 in Power Distribution Panel (PD1) (8) Position electrical distribution block cover on power distribution shelf. (9) Tighten wing nut on electrical distribution block cover. (10) Install wing screw on power distribution shelf. CONTINUITY TEST NOTE