CONTINUITY TEST TM 9-2320-365-20-2 Change 2 2-1991 (1) Remove circuit breaker CB1 from Power Distribution Panel (PD2). (2) Set multimeter to ohms. (3) Connect positive (+) probe of multimeter to one terminal of circuit breaker CB1. (4) Connect negative (-) probe of multimeter to other terminal of circuit breaker CB1 and note reading on multimeter. (5) If continuity is not present, replace circuit breaker CB1 (para 20-87). (6) Install circuit breaker CB1 in Power Distribution Panel (PD2).