TM-9-2320-365-20-1 LMTV Unit Maintenance Manual M1078 Series - Volume 1 Download

Page 997 of 1760

TM 9-2320-365-20-1 TM 9-2320-365-20-1 TM 9-2320-365-20-1 TM 9-2320-365-20-1 TM 9-2320-365-20-1 2-611 2-611 2-611 2-611 2-611 CONTINUITY TEST (1) Remove main light switch (para 7-17). (2) Set multimeter to ohms. (3) Connect positive (+) probe of multimeter to main light switch terminal F. (4) Connect negative (-) probe of multimeter to main light switch terminal D. (5) Position main light switch to BO DRIVE (TM 9-2320-365-10) and note reading on multimeter. (6) If continuity is not present, replace main light switch (para 7-17). (7) Position main light switch to OFF (TM 9-2320-365-10). (8) Install main light switch (para 7-17).