TM-9-2320-365-20-1 LMTV Unit Maintenance Manual M1078 Series - Volume 1 Download

Page 771 of 1760

TM 9-2320-365-20-1 TM 9-2320-365-20-1 TM 9-2320-365-20-1 TM 9-2320-365-20-1 TM 9-2320-365-20-1 2-507 2-507 2-507 2-507 2-507 CONTINUITY TEST (1) Remove PDP cover (para 16-2). (2) Remove relay K11 from PDP. (3) Set multimeter to ohms. (4) Connect positive (+) probe of multimeter to PDP, terminal 85, where relay K11 was removed. (5) Connect negative (-) probe of multimeter to PX7-23 and note reading on multimeter. (6) If continuity is not present, repair wire 34A (para 2-40) or replace WTEC II dashboard cable assembly (para 7-10) or WTEC III dashboard cable assembly (para 7-11). (7) Install relay K11 in PDP. (8) Install PDP cover (para 16-2). (9) Connect lighted indicator display to connector PX7. (10) Position lighted indicator display in instrument panel assembly with four screws. (11) Tighten four screws to 6-10 lb-in. (1 N·m). (12) Connect batteries (para 7-48).