TM-9-2320-365-20-1 LMTV Unit Maintenance Manual M1078 Series - Volume 1 Download
Page 731 of 1760
TM 9-2320-365-20-1 TM 9-2320-365-20-1 TM 9-2320-365-20-1 TM 9-2320-365-20-1 TM 9-2320-365-20-1 2-471 2-471 2-471 2-471 2-471 CONTINUITY TEST (1) Disconnect connector P210 from connector J210. (2) Set multimeter to ohms. (3) Connect positive (+) probe of multimeter to J210-6. (4) Connect negative (-) probe of multimeter to P913-13 and note reading on multimeter. (5) If continuity is not present, repair wire 2021 (para 2-40) or replace auxiliary panel cable assembly (all models except M1079 w/o winch) (para 7-49) or M1079 w/o winch auxiliary panel cable assembly (para 7-50). (6) If continuity is present, repair wire 2021 (para 2-40) or replace PTO cable assembly (para 7-77). (7) Connect connector J210 to connector P210. (8) Connect connector P913 to connector J913. (9) Install personnel heater (para 18-9).