TM-9-2320-365-20-1 LMTV Unit Maintenance Manual M1078 Series - Volume 1 Download

Page 649 of 1760

TM 9-2320-365-20-1 TM 9-2320-365-20-1 TM 9-2320-365-20-1 TM 9-2320-365-20-1 TM 9-2320-365-20-1 2-405 2-405 2-405 2-405 2-405 CONTINUITY TEST CONTINUITY TEST (1) Raise cab (TM 9-2320-365-10). (2) Set multimeter to ohms. (3) Disconnect connector clamp from connector J37. (4) Disconnect connector P37 from connector J37. (5) Connect positive (+) probe of multimeter to connector P37-2. (6) Connect negative (-) probe of multimeter to connector PX7-12 and note reading on multimeter. (7) If continuity is not present, go to step 5 of this fault. (1) Set multimeter to ohms. (2) Connect positive (+) probe of multimeter to connector P37-1. (3) Connect negative (-) probe of multimeter to ground and note reading on multimeter. (4) If continuity is not present, go to step 6 of this fault. (5) If continuity is present, replace water temperature switch (para 7-42). (6) Connect connector P37 to connector J37. (7) Connect connector clamp on connector J37. (8) Lower cab (TM 9-2320-365-10).