TM-9-2320-365-20-1 LMTV Unit Maintenance Manual M1078 Series - Volume 1 Download
Page 1639 of 1760
TM 9-2320-365-20-1 Change 2 INDEX-23 Subject Para P (Cont) PDP (Cont) 200 Amp Terminal Block to Power Distribution Panel (PDP) 12 VDC Cable Replacement ....................................... 20-65 200 Amp Terminal Block to Power Distribution Panel (PDP) 24 VDC Cable Replacement ....................................... 20-68 Personnel Heater Fan Does Not Operate ........................... 2-16 Heater Hoses Replacement ................................. 6-8 Heater Illumination Does Not Operate ................. 2-16 Heater Replacement/Repair ............................... 18-9 Pipe Exhaust Pipe Replacement ................................. 5-3 Platform Machine Gun Ring Lower Platform Replacement ................................................. 21-3 Machine Gun Ring Top Platform Replacement ................................................. 21-4 Plunger Front Brake Plunger Assembly Replacement/Repair ....................................... 11-4 Rear Brake Plunger Assembly Replacement/Repair ....................................... 11-5 PMCS Preventive Maintenance Checks and Services (PMCS) Introduction ............................ 2-7 Preventive Maintenance Checks and Services (PMCS) Table ..................................... 2-9 Pod M1079 Pod Door and Panel Replacement ................................................ 16-22 M1079 Pod Frame Replacement/Repair ............ 16-23 Power Distribution Panel (PDP) Cover and Latch Replacement/Adjustment ....................... 16-2 Distribution Panel (PDP) to Cab Ground Cable Replacement ........................................ 7-76 Low Engine Power ............................................ 2-12 M1079 Air Conditioner Power Cable Replacement ................................................ 20-82 M1079 Heater Fuel Pump Power Cable Replacement ................................................ 20-49 M1079 Heater Power Cable Replacement ................................................ 20-42 M1079 110/208 VAC Power Distribution Panel Replacement ....................................... 16-66 M1079 110/208 VAC Power Does Not Operate ......................................................... 2-16 M1079 101/208 VAC Power Entry Panel and Conduit Replacement .............................. 16-70 Subject Para P (Cont) Power (Cont) M1079 110/208 VAC Power In/Out Cable Replacement ....................................... 16-68 M1079 12/24 VDC Power Entry Connector Replacement ................................ 16-71 M1079 12/24 VDC Power Entry Panel and Conduit Replacement .............................. 16-72 Master Power Switch Does Not Shut Down Engine ................................................. 2-16 No Power to Digitization Rack ........................... 2-31 No Power to Driver Visual Enhancement (DVE) ........................................................... 2-31 No Power to Enhanced Position Location Reporting System (EPLRS) ............................ 2-31 No Power to Mobile Tracking system (MTS) ........ 2-31 No Power to Mobile Tracking System (MTS) Sense ........................................................... 2-31 No Power to Precision Lightweight Global Positioning System Receiver (PLGR) ............... 2-31 No Power to SINCGAR/Force XXI Battle Command Brigade and Below (FBCB) .............. 2-31 Steering Hoses and Tube Replacement .............. 13-7 Steering Pump Replacement ............................. 13-9 Steering Pump Reservoir and Bracket Replacement ................................................. 13-8 Take-Off (PTO) Cable Assembly Replacement ................................................. 7-77 Take Off (PTO) Troubleshooting ......................... 2-19 100 Amp Reverse Polarity Relay to Power Distribution Panel (PDP) 12 VDC Cable Replacement ................................................. 7-80 100 Amp Reverse Polarity Relay to Power Distribution Panel (PDP) 24 VDC Cable Replacement ................................................. 7-81 200 Amp Terminal Block to Power Distribution Panel (PDP) 12 VDC Cable Replacement ................................................ 20-65 200 Amp Terminal Block to Power Distribution Panel (PDP) 24 VDC Cable Replacement ................................................ 20-68 Powertrain .......................................................... 1-10 Preparation for Storage or Shipment .................................... 2-44 for Storage or Shipment Introduction .................. 2-43 M1079 Van Preparation For Air Transport ...................................................... 16-73 Pressure Air Pressure Transmitter Replacement ............... 7-36 Engine Oil Pressure Gage Does Not Operate or Is Inaccurate ................................. 2-16 Engine Oil Pressure Indicator Does Not Operate ......................................................... 2-16