TM-9-2320-365-20-1 LMTV Unit Maintenance Manual M1078 Series - Volume 1 Download

Page 1423 of 1760

TM 9-2320-365-20-1 Change 2 2-1007 CONTINUITY TEST (1) Set multimeter to ohms. (2) Connect positve (+) probe of multimeter to connector P115-22. (3) Connect negative (-) probe of multimeter to PDP, terminal 86, where WTEC III relay K37 was removed, and note reading on multimeter. (4) If continuity is not present, repair wire 112 (para 2-40) or replace WTEC III dashboard cable assembly (para 7-11). (5) Connect connector P115 to WTEC III transmission ECU. (6) Connect connector clamp on connector P115.