TM-9-2320-365-20-1 LMTV Unit Maintenance Manual M1078 Series - Volume 1 Download

Page 1419 of 1760

TM 9-2320-365-20-1 Change 2 2-1003 CONTINUITY TEST (1) Remove WTEC III relay K37 from PDP. (2) Set multimeter to ohms. (3) Connect positive (+) probe of multimeter to PDP, terminal 85, where WTEC III relay K37 was removed. (4) Connect negative (-) probe of multimeter to ground and note reading on multimeter. (5) If continuity is not present, repair wire 3101 (para 2-40) or replace WTEC III dashboard cable assembly (para 7-11).