TM-9-2320-365-20-1 LMTV Unit Maintenance Manual M1078 Series - Volume 1 Download
Page 1407 of 1760
TM 9-2320-365-20-1 Change 2 2-991 CONTINUITY TEST (1) Disconnect connector P210 from connector J210. (2) Set multimeter to ohms. (3) Connect positive (+) probe of multimeter to connector P913-14. (4) Connect negative (-) probe of multimeter to connector J210-4 and note reading on multimeter. (5) If continuity is not present, repair wire 2019 (para 2-40) or replace auxiliary panel cable assembly (all models except M1079 w/o winch) (para 7-49). (6) If continuity is present, replace WTEC II relay SF02 (para 8-6). (7) Connect connector P913 to connector J913. (8) Connect connector J210 to connector P210. (9) Install personnel heater (para 18-9).