TM-9-2320-365-20-1 LMTV Unit Maintenance Manual M1078 Series - Volume 1 Download

Page 1385 of 1760

TM 9-2320-365-20-1 Change 2 2-969 CONTINUITY TEST (1) Set multimeter to ohms. (2) Connect positive (+) probe of multimeter to connector J215-1. (3) Connect negative (-) probe of multimeter to winch out solenoid L5 connector terminal 1 and note reading on multimeter. (4) If continuity is not present, repair wire 2008 (para 2-40) or replace winch control valve cable assembly (para 7-85). (5) If continuity is present, notify DS Maintenance. (6) Connect connector P215 to connector J215. (7) Connect winch out solenoid L5 connector to solenoid L5 and tighten screw.