TM-9-2320-365-20-1 LMTV Unit Maintenance Manual M1078 Series - Volume 1 Download
Page 1377 of 1760
TM 9-2320-365-20-1 Change 2 2-961 CONTINUITY TEST (1) Set multimeter to ohms. (2) Connect positive (+) probe of multimeter to winch out solenoid L5 terminal 2. (3) Connect negative (-) probe of multimeter to ground and note reading on multimeter. (4) If continuity is not present, repair wire 3070 (para 2-40) or replace winch control valve cable cable assembly (para 7-85). (5) If continuity is present, replace winch control valve assembly (para 17-6). (6) Connect winch out solenoid L5 connector on solenoid L5 and tighten screw.