TM-9-2320-365-20-1 LMTV Unit Maintenance Manual M1078 Series - Volume 1 Download
Page 1359 of 1760
TM 9-2320-365-20-1 TM 9-2320-365-20-1 TM 9-2320-365-20-1 TM 9-2320-365-20-1 TM 9-2320-365-20-1 2-943 2-943 2-943 2-943 2-943 CONTINUITY TEST CONTINUITY TEST (1) Remove kick panel (para 16-3). (2) Disconnect connector P112 from manifold valve assembly. (3) Set multimeter to ohms. (4) Connect positive (+) probe of multimeter to connector P110-C. (5) Connect negative (-) probe of multimeter to connector P112-E and note reading on multimeter. (6) If continuity is not present, replace CTIS cable assembly (para 7-53). (1) Set multimeter to ohms. (2) Connect positive (+) probe of multimeter to connector P110-F. (3) Connect negative (-) probe of multimeter to connector P112-A and note reading on multimeter. (4) If continuity is not present, replace CTIS cable assembly (para 7-53).