TM-9-2320-365-20-1 LMTV Unit Maintenance Manual M1078 Series - Volume 1 Download
Page 1349 of 1760
TM 9-2320-365-20-1 TM 9-2320-365-20-1 TM 9-2320-365-20-1 TM 9-2320-365-20-1 TM 9-2320-365-20-1  2-933 2-933 2-933 2-933 2-933  CONTINUITY TEST  CONTINUITY TEST  (1) Remove kick panel (para 16-3).  (2) Disconnect connector P112 from manifold  valve assembly.  (3) Set multimeter to ohms.  (4) Connect positive (+) probe of multimeter to  connector P110-C.  (5) Connect negative (-) probe of multimeter to  connector P112-E and note reading on  multimeter.  (6) If continuity is not present, replace CTIS cable  assembly (para 7-53).  (1) Set multimeter to ohms.  (2) Connect positive (+) probe of multimeter to  connector P110-F.  (3) Connect negative (-) probe of multimeter to  connector P112-A and note reading on  multimeter.  (4) If continuity is not present, replace CTIS  cable assembly (para 7-53).