TM-9-2320-365-20-1 LMTV Unit Maintenance Manual M1078 Series - Volume 1 Download

Page 1343 of 1760

TM 9-2320-365-20-1 TM 9-2320-365-20-1 TM 9-2320-365-20-1 TM 9-2320-365-20-1 TM 9-2320-365-20-1 2-927 2-927 2-927 2-927 2-927 CONTINUITY TEST CONTINUITY TEST (1) Disconnect connector P113 from manifold valve assembly. (2) Set multimeter to ohms. (3) Connect positive (+) probe of multimeter to connector P110-b. (4) Connect negative (-) probe of multimeter to connector P113-B and note reading on multimeter. (5) If continuity is not present, replace CTIS cable assembly (para 7-53). (1) Set multimeter to ohms. (2) Connect positive (+) probe of multimeter to connector P110-c. (3) Connect negative (-) probe of multimeter to connector P113-C and note reading on multimeter. (4) If continuity is not present, replace CTIS cable assembly (para 7-53).