TM-9-2320-365-20-1 LMTV Unit Maintenance Manual M1078 Series - Volume 1 Download
Page 1335 of 1760
TM 9-2320-365-20-1 CONTINUITY TEST Change 2 2-919 (1) Remove kick panel (para 16-3). (2) Disconnect connector J111 from connector P111. (3) Set multimeter to ohms. (4) Connect positive (+) probe of multimeter to connector P110 socket F. (5) Connect negative (-) probe of multimeter to connector P111 pin A and note reading on multimeter. (6) If continuity is not present replace CTIS cable assembly (para 7-53). (7) If continuity is present, repair wire 3031 from connector J111 socket A to terminal board TB2 position 35 (para 2-40) or replace WTEC II dashboard cable assembly (para 7-10) or WTEC III dashboard cable assembly (para 7-11). (8) Connect connector J111 to connector P111. (9) Install kick panel (para 16-3). (10) Connect connector P110 to CTIS ECU.