TM-9-2320-365-20-1 LMTV Unit Maintenance Manual M1078 Series - Volume 1 Download

Page 1331 of 1760

TM 9-2320-365-20-1 CONTINUITY TEST Change 2 2-918.17 (1) Connect connector P110 to CTIS ECU. (2) Remove instrument panel assembly for access (para 7-15). (3) Disconnect connector J43 from connector P43. (4) Set multimeter to ohms. (5) Connect positive (+) probe of multimeter to connector J43 socket 2. (6) Connect negative (-) probe of multimeter to connector J111 socket F and note reading on multimeter. (7) If continuity is not present, repair wire 1790 from connector J43 socket 2 to connector J111 socket F (para 2-40) or replace WTEC II dashboard cable assembly (para 7-10) or WTEC III dashboard cable assembly (para 7-11). (8) If continuity is present, repair wire 1790 from connector P43 pin 2 to connector P84 socket B (para 2-40) or replace start and charging cable assembly (para 7-82). (9) Connect connector P43 to connector J43. (10) Install instrument panel assembly (para 7-15). (11) Connect connector J111 to connector P111. (12) Install kick panel (para 16-3).