TM-9-2320-365-20-1 LMTV Unit Maintenance Manual M1078 Series - Volume 1 Download

Page 1019 of 1760

TM 9-2320-365-20-1 TM 9-2320-365-20-1 TM 9-2320-365-20-1 TM 9-2320-365-20-1 TM 9-2320-365-20-1 2-633 2-633 2-633 2-633 2-633 CONTINUITY TEST CONTINUITY TEST (1) Remove PDP cover (para 16-2). (2) Remove relay K13 from PDP. (3) Set multimeter to ohms. (4) Connect positive (+) probe of multimeter to PDP, socket 86, where relay K13 was removed. (5) Connect negative (-) probe of multimeter to connector PX12-1 and note reading on multimeter. (6) If continuity is not present, repair wire 1559 (para 2-40) or replace WTEC II dashboard cable assembly (para 7-10) or WTEC III dashboard cable assembly (para 7-11). (7) Connect connector PX12 to warning light switch. (8) Install instrument panel assembly (para 7-15). (1) Set multimeter to ohms. (2) Connect positive (+) probe of multimeter to PDP, socket 85, where relay K13 was removed. (3) Connect negative (-) probe of multimeter to ground and note reading on multimeter. (4) If continuity is not present, repair wire 3054 (para 2-40) or replace WTEC II dashboard cable assembly (para 7-10) or WTEC III dashboard cable assembly (para 7-11).