TM 9-2320-365-10 3-10. M1081 AIR DROP PREPARATION (CONT) (4) Position turret (7) on mast (5). (5) Install quick release pin (8) in turret (7). WARNING Light Material Handling Crane (LMHC) boom and winch weighs approximately 110 lbs (50 kgs). The aid of an assistant is required to install LMHC boom and winch. Fai-lure to comply may result in injury to personnel or damage to equipment. (6) Position LMHC boom (9) on turret (7). (7) Install quick release pins (10 and 11) in turret (7). (8) Set LMHC boom (9) to 25-degrees (para 2-24f). (9) Extend LMHC boom (9) fully (para 2- 24g). (10) Connect remote control and power cable connectors (para 2-24d). (11) Raise cab (para 2-22a). (12) Release latch (12) on ratchet (13). (13) Lift ratchet (13) and release strap (14). (14) Remove strap (14) from ratchet (13). 3-110.2 Change 1