TM-9-2320-365-10 LMTV Operator Manual M1078 Series Download
Page 302 of 836
TM 9-2320-365-10 2-24. LIGHT MATERIAL HANDLING CRANE (LMHC) OPERATION (CONT) (14) Adjust boom (1) so that end of boom is in line with cargo bed tiedown ring (7). (15) Place hoist control switch (8) in up position to pay out cable (9). 2-202