TM-9-2320-365-10 LMTV Operator Manual M1078 Series Download
Page 296 of 836
TM 9-2320-365-10 2-24. LIGHT MATERIAL HANDLING CRANE (LMHC) OPERATION (CONT) j. Raise and Lower Load. CAUTION • Do not lift load over maximum load rating for Light Material Handling Crane (LMHC). Failure to comply may result in damage to equipment. • Use only a straight pull when lifting load. Failure to comply may result in damage to equipment. • After performing eight cycles with LMHC, allow 30 minutes to cool down. A cycle is defined as pickup, move, and place a load. A cycle may be from cargo bed of vehicle to ground or ground to cargo bed of vehicle. Failure to comply may result in damage to equipment. NOTE Steps (1) through (7) require the aid of an assistant. (1) Adjust boom (1) until end of boom is over load (para 2-24g). (2) Place hoist control switch (2) in up position to pay out cable (3). (3) Connect hook (4) to load. 2-196