TM-9-2990-205-34&P Parts Manual, Tools and Maintenance for Turbocharger Model 5HDR Download
Page 63 of 128
TM 9--2990--205--34&P 0012 00--1 ASSEMBLY AND OPERATIONAL TESTING 0012 00 THIS WORK PACKAGE COVERS: Assembly and Operational Testing INITIAL SETUP: Tools and Special Tools General mechanic’s tool kit (item 1, WP 0017 00) Installing sleeve (Fig 4, item 3, WP 0015 00) Retaining ring pliers (Fig 4, item 2, WP 0015 00) Box end wrench (special tool) (Fig 4, item 4, WP 0015 00) 5/8 inch, 1/2 inch drive deep well socket (item 8, WP 0017 00) 9/16 inch, 1/2 inch drive deep well socket (item 9, WP 0017 00) Feeler gages (item 10, WP 0017 00) 3/8 inch crowfoot attachment (item 11, WP 0017 00) Materials/Parts Oil drain tube gasket (Figs 2 and 3, item 54, WP 0015 00) Equipment Condition Turbo components on work bench; cleaned, inspected and repaired NOTE Assemble the turbo according to the following procedures. Use special care to ensure the cleanliness of each part. Coat each part with a light film of engine oil (OE/HDO) immediately before installation. All parts discarded during disassembly are replaced with new parts during assembly. Requi- sition turbosupercharger parts kit, part number 5705073. Refer to WP 0015 00. All kit parts listed in the Repair Parts and Special Tools List for your configuration of turbo (”clean air” or standard) must be used during assembly.