TM-9-2815-220-34 Direct Support Manual for AVDS-1790-2C and AVDS-1790-2D Engines Download

Page 494 of 532

TM 9-2815-220-34 EJECTOR TUBE TA265594 Fi gure 4-14. Removing or Installing Dust Ejector Exhaust Pipe Figure 4-15. Removing or Installing Dusi Ejector Scavenge Tube and Exhaust Pipe Cap Assembly TA265596 Figure 4-16 Removing or Install ing Transmission Breather Tube b. Ins taa ti on. (1) Left bank. (a) Install ejector tube (fig. 4-14) on turbo- supercharger and into hose using new gasket. Secure ejector tube with six self-Jocking nuts. lnstall loop clamp on breather tube and secure clamp to bracket with machine boJt and self-lock- ing nut. (b) Position assembled scavenge tube and exhaust pipe cap assembly (fig. 4-15) onto left bank ·ejector tube (fig. 4-14) above and parallel to the engine and transmission oil coolers. Secure loop clrunps (fig. 4-15) to bracket with capscrews and self-locking nuts. Tighten hose clamps. (2) Right bank. (a) InstaU right bank dust ejector system in a maimer similar to paragraph (J) above. (b) Install elbow (fig. 4-J 6) in ejector tube. Install trnnsmissioJ1 breather tube on elbow and tighten nut. Section IV. REPAIR OF DUST DETECTOR SYSTEM 4-8. General.  section covers the repair of the dust detector system. Ref er to paragraphs 3-35 through 341 for 4-10 Change 3 general pair procedures. Specific instructions on disassembly, cleaning, inspection, and assembly accompany the repair instructions. ) )-