TM-9-2815-220-24 Maintenance Manual for AVDS-1790-2CA AVDS-1790-DA and AVDS-1790-2DR Engines Download
Page 788 of 1563
TM 9-2815-220-24 ENGINE AND CONTAINER REPLACEMENT 0098 00 INSTALLATION (Continued) 5. Secure engine mounting brackets (16) to mounting flanges (17) using four nuts (14) with lock washers (15). 6. Secure transmission adapter (12) to support flange (13) using seven nuts (10) with lock washers (11). 7. Attach gasket (9) to upper half of container (8). 8. Attach sling (7) (item 105, WP 0176) to upper half of container (8) and to hoist. 9. With helper to guide the load, carefully lower container upper half (8) in place over lower half (22). 10. Secure container halves (8) and (22) using 48 screws (6), and nuts (4) with lock washers (5). 11. Remove sling (7) from container half (8) and from hoist. 12. Install valve core (2) into pneumatic valve (3) then fill container assembly (1) to 5 psi (34.475 kPa) gauge pressure using clean dry air. 6 11 10 13 12 22 2 3 7 8 9 4 5 1 END OF WORK PACKAGE WP 0098 00-6