TM-9-2815-220-24 Maintenance Manual for AVDS-1790-2CA AVDS-1790-DA and AVDS-1790-2DR Engines Download
Page 783 of 1563
TM 9-2815-220-24 ENGINE AND CONTAINER REPLACEMENT 0098 00 THIS WORK PACKAGE COVERS: Removal, Installation INITIAL SETUP: Tools: Air pressure source Engine multiple-leg sling: For 2CA or 2DA, use item 38, WP 0176 For 2DR, use item 37 WP 0176 Four-leg sling (for container) (item 105, WP 0176) General mechanic’s tool kit (item 121, WP 0176) Hoist Tools (Continued): Pneumatic tire valve repair tool (item 98, WP 0176) Personnel Required: Track Vehicle Repairer (63H10), and Helper Equipment Condition: Engine out of vehicle and separated from transmission REMOVAL 1. Release air pressure from container assembly (1) by removing the valve core (2) from pneumatic valve (3) using pneumatic tire valve repair tool. 2. Remove 48 nuts (4), lock washers (5), and screws (6) from container assembly (1). Retain parts for reassembly. 6 3 2 4 5 1 WP 0098 00-1