TM-9-2815-200-35 Maintenance Manual for AVDS-1790-2M AVDS-1790-2A and AVDS-1790-2AM Engines Download
Page 555 of 779
Table 8-6.50 Hour Quality Control Test Run No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time 1 hour ½ hour 1½ hour ½ hour 2 hours ½ hour 2 hours 1 hour 5 hours 1 hour 5 hours 1 hour 5 hours 1 hour 5 hours 1 hour 5 hours 1 hour 5 hours 1 hour 5 hours 5 min. 5 min. 5 min. 8-8. General This section of the manual covers Engine Speed ½ load Idle Full load Idle ½ load Idle Full load Idle Full load Idle Full load Idle Full load Idle Full load Idle Full load Idle Full load Idle Full load Full load Full load Full load Section II. ENGINE AND CONTAINER the reusable metal container, Army Part No. 10912269, and procedures for preservation of engines for storage. The container is designed to provide substantial protection against damage for the engine during transit, and also against en- vironmental deterioration over extended periods of storage. The following instructions will cover the removal of the engine from the container, reconditioning and testing of the container, preservation of engines for storage, the in- stallation of the engine in the container, sealing, and periodic inspection. 8-9. Disassembling Container and Removing Engine a. Prior to disassembling the metal container, the pressure must first be released through the Rack Setting 2000 rpm 700 rpm 2400 rpm 700 rpm 2000 rpm 700 rpm 2400 rpm 700 rpm 2400 rpm 700 rpm 2400 rpm 700 rpm 2400 rpm 700 rpm 2400 rpm 700 rpm 2400 rpm 700 rpm 2400 rpm 700 rpm 2400 rpm 2200 rpm 2000 rpm 1800 rpm pressure relief valve (fig. 8-7), located in a recessed insert on the end of the container. Remove all nuts, lock washers and bolts securing the upper and lower container sections together. Remove upper section of container and retain sealing gasket (providing it has not been mutilated and is still serviceable). Remove the seven bolts and lock washers securing the engine to the transmission adapter support flange and the four nuts and lock washers securing the engine mounting brackets to the mounting flanges on the engine support cross members. Remove all engine parts previously removed from the engine and secured separately in the container. In cases where the engine has been returned for rebuild, forward these parts to the proper reconditioning area. 8-13