TM-9-2815-200-35 Maintenance Manual for AVDS-1790-2M AVDS-1790-2A and AVDS-1790-2AM Engines Download

Page 541 of 779

d. Time Totalizing Meter. Refer to figures 5- 5, 5-4, and 4-10. Note. After installing time totalizing meter on engine, the engine name plate must be stamped with an “X” after the engine serial number. This will show engine has a time totalizing meter installed. The time totalizing meter must be set back to zero (para 6-70b) before being installed. e. Generator and Associated Parts. Refer to figures 7-35, 4-17 through 4-13, and figure 4-11. 1. 2. 3. 4. Position cradle (A) on generator support, Install two self-locking nuts (B) and flat washers but do not tighten. Install clamping bar (C) on “U” bolt. Install self-locking nut (D). Tighten nut until ap- proximately ~8 -inch of bolt is exposed through the nut. This is the approximate position of nut after “U” bolt has been positioned over the generator, prior to in- stalling the outside bar and nut. Note. The preformed packing (fig. 4-12) is a generator part and must be in place before in- stalling generator air intake tube. Figure 7-35. Assembling generator cradle, support, and “U’’ bolt. f. Test and Adjustments. After the egine has been completely assembled it should be tested and the necessary adjustments made as directed in Chapter 8 of this manual. 7-29