TM-9-2815-200-35 Maintenance Manual for AVDS-1790-2M AVDS-1790-2A and AVDS-1790-2AM Engines Download

Page 224 of 779

Remove 1. Remove eight self-locking nuts (A) and bolts. Remove four plates and eight tube clamps from four left tube clamp supports. 2. Remove four self-locking nuts (B) and bolts. Remove two plates and four tube clamps from double tube clamp support. 3. Remove four self-locking nuts (C) and bolts. Remove four plates and tube clamps. 4. Remove four self-locking nuts (D) and bolts. Remove four plates and tube clamps. 5. Remove four self-locking nuts (E) and bolts. Remove two plates and four tube clamps from angle brackets. 6. Remove six self-locking nuts (F) and bolts. Remove three plates and six tube clamps from three right tube clamp supports. Install 1. Position two tube clamps, one under and one over fuel injector tubes, and plate on top of each clamp at each right tube clamp support. Install six self-locking nuts (F) and bolts securing clamps. 2. Position two tube clamps, one under and one over fuel injector tubes, and plate on top of each clamp at angle brackets. Install four self-locking nuts (E) and bolts securing clamps. 3. Position two clamps, one under and one over fuel injector tubes, and one plate under and one over each clamp at location shown. Install four self-locking nuts (D) and bolts securing clamps. 4. Position two clamps, one under and one over outer two fuel injector tubes at location shown, and one plate under and one over each clamp. Install four self-locking nuts (C) and bolts securing clamps. 5. Position two clamps, one under and one over fuel injector tubes and one plate on top of each clamp at double tube clamp support. Install four self-locking nuts (B) and bolts securing clamps. 6. Position two clamps, one under and one over fuel injector tubes, and plate on top of each clamp at each left tube clamp support. Install eight self-locking nuts (A) and bolts securing clamps. Figure 5-65. Removing or installing fuel injector tube 5-38 clamps-engines with additional clamps.