NMWR-9-2815-220 Overhaul Manual for M60 M88 Engine AVDS-1790-2CA, AVDS-1790-2DA, AVDS-1790-2DR Download

Page 902 of 1014

NMWR 9-2815-220 QUALITY ASSURANCE/QUALITY CONTROL (QA/QC) REQUIREMENTS—Continued 0048 00 DEFECTIVE MATERIEL 1. Material condition tags/labels will be used to identify materiel when such materiel may become mixed during storage or shipment within the installation, or where physical evidence is necessary for materiel control to prevent duplicate inspections. These forms are not for indiscriminate use on materiel that presents no problem in storage or shipping. The materiel condition tags and labels to be used in identifying materiel are itemized and their uses explained in Table 1. A complete list of condition codes is given in Table 2. 2. The tags/labels conspicuously marked “Serviceable,” “Unserviceable (Repairable),” “Unserviceable (Condemned),” “Suspended,” or “Test/Modification,” as applicable, will contained adequate information regarding the identity and condition of the item. 3. It is important that these tags/labels are not removed, defaced, mutilated, or altered to avoid duplication of work in re-determining the condition of the materiel. 4. Any additional information or data required to assist in materiel control may be added to the tags/labels, provided such data is compatible with the prescribed usage of each tag/label. 5. Waiver Form. All departures from this NMWR, referenced manuals, specifications, drawings, and the Quality Assurance Requirements will be considered nonconforming materiel and will require waiver form USATACOM. All waiver requests will be documented on DD Form 1694 and forwarded to USATACOM, ATTN: AMSTA-LC-CAF. QUALITY ASSURANCE PLAN 1. The NMM shall provide and maintain an inspection system acceptable to the Government. Records of all inspection work by the NMM shall be kept complete and available to the Government during the performance of the contract/work directive. 2. Current written description of the NMM’s inspection system will be available for review by the Government quality assurance representative 30 days prior to the start of overhaul program. 3. All deficiencies found during the course of inspection, including recurring deficiencies, shall be recorded. In addition, the responsible quality assurance activity must initiate a request for corrective action to the overhaul activity to eliminate the conditions which caused the deficiencies. Corrective action taken will be recorded. 4. When any work segment as set forth in this National Maintenance Work Requirement cannot be accomplished in a manner other than specified, prior approval of the procuring activity shall be obtained by immediately submitting to the contracting officer a written notice containing the following information: a. Serial number (if applicable), part number, and NSN of affected equipment. b. Work elements which will not be completed or which will not be accomplished exactly as specified herein. c. Reason for non-accomplishment or deviation. d. Action taken to correct condition causing non-accomplishment or need for deviation. e. Data relative to availability of parts required, if applicable. f. Estimated man-hours. g. Instructions and inspection required to maintain the integrity of the end item because of such omission or deviation. 0048 00-2 Change 1